Wed, Apr 24, 2024
28.12°C Kathmandu
Air Quality in Kathmandu: 194Miscellaneous
Swollen river sweeps away hydro power canal
The Badighat River Hydro Power Project located at Neta VDC – 2 in Gulmi is yet to resume operation after a flooding in the river swept away 100 meters of canal.bookmark
Published at : September 24, 2016
Updated at : September 24, 2016 20:45
Gulmi
The Badighat River Hydro Power Project located at Neta VDC – 2 in Gulmi is yet to resume operation after a flooding in the river swept away 100 meters of canal.
Two months ago, the teeming monsoon rain had caused the Badi river to swell. The electric power service was obstructed after the canal was swept away.
More than two thousand students enrolled at various schools have been affected in the absence of electric power, Project's Chairman, Ram Raj Ghimire said. More than thousand businesses have shutdown in Gulmi and Baglung.
Ghimire assured that the project would be resorted before the onset of the festive season which is just around the corner. RSS
Editor's Picks
E-PAPER | April 24, 2024
×